What we did
When we walked into this two-car garage, we found new concrete with no cracks and no old coating to strip. That's about as good a starting point as we get. With a clean slab, the job came down to prepping it right and covering the full 800 square feet, which took in the outside edge, along with 100 linear feet of vertical concrete where the slab meets the walls. It also meant the whole install could fit into a single day.
Even new concrete needs work before a coating goes on. A fresh slab has a smooth surface sheen that a coating can't grip well, so we diamond ground the floor to take that sheen off along with any contaminants. Grinding leaves a profile, a texture a bit like coarse sandpaper, that the base coat can lock into. That's why we choose diamond grinding over acid etching: it's more controlled and gives a consistent surface. The vertical edges were profiled too, so they'd take the coating the same way.
Next came the polyurea base coat, the layer that bonds to the concrete. We broadcast Coyote flake into it until the floor wouldn't hold any more, which we call broadcasting to rejection, so there are no thin or bare spots. After it set, we scraped and vacuumed the loose flakes and applied a clear polyaspartic topcoat. Aluminum oxide grit went into that topcoat across all 800 square feet for better traction underfoot. The same system ran up the 100 linear feet of vertical surfaces, sealing floor and edges as one continuous coat.
Start to finish, the install took 1 day. The homeowner could walk on the floor after about 12 hours, and it was ready for full use, cars included, after about 48 hours. The added grit helps with traction, though a wet or oily floor still calls for normal care. If you've got a newer slab with no cracks or old coating, your project would look a lot like this one, with the time going into prep and the coating itself instead of repairs.